Skip to content
  • Projects
  • Services
  • About
  • Jobs
  • Contact
  • News
  • Projects
  • Services
  • About
  • Jobs
  • Contact
  • News
MDC_DMG_DING_055_jan26_1165_LR
design-museum-gent-ding-timber-extension

19.080

Design Museum Gent

Belgium

Ghent

Context

Cultural institutions are increasingly seeking low-carbon structural solutions that combine architectural expression, demanding functional requirements and the sensitive transformation of historic buildings. The DING extension of Design Museum Gent provides a relevant case study of this challenge. Located on a constrained heritage site in the centre of Ghent, the project originated from the long-standing ambition to develop a residual plot in the Drabstraat, left vacant since the museum’s 1992 extension, and to complete the connection between the existing museum buildings. Commissioned by the City of Ghent and designed by Carmody Groarke, ATAMA and RE-ST, the new wing accommodates additional exhibition spaces, a shop and catering facilities. Its design combines a highly irregular geometry, long-span floors, significant imposed loads and numerous interfaces with the historic structures.

Particularities

The project combines a highly irregular mass-timber structure with the constraints of a sensitive heritage site. Long-span ribbed floors with beech LVL ribs, reaching up to 12 m, create column-free exhibition spaces while supporting high imposed loads. On the upper levels, cantilevered CLT shear walls carry the set-back storeys and external terraces. Beech LVL was also used for the museum’s main staircase, whose complex three-dimensional geometry required advanced fabrication and connection detailing. New timber walls were erected behind a preserved historic façade to carry vertical loads and ensure its out-of-plane stability. The timber structure also plays a key role in the renovation of the existing museum. Lightweight CLT panels were inserted to create new exhibition floors. Particular attention was given to construction tolerances, erection sequencing, moisture protection and the interfaces between new timber elements and the existing masonry. The project’s low-carbon ambition extends beyond the structure through material reuse and the development of a locally produced façade brick made from recycled municipal waste.

Mission Type
Complete mission by Ney & PartnersExecution studies - timber structure by WOW engineeringTimber structure by WOW engineering
Location

Jan Breydelstraat 5, 9000 Ghent, BELGIUM

Study
2020
– 2021
Execution
2022
–2026
Architect
ATAMACarmody GroarkeRest
Client
City of Ghent
Contractor
Artes
© Copyrights
Michiel De Cleene

Modelisation

19.080 PRO MOD GLOBAL
19.080 PRO MOD DETAIL
19.080 PRO MOD DETAILS

Construction site

WOWengineering_DesignMuseum_Culture_Belgium_023
WOWengineering_DesignMuseum_Culture_Belgium_017
WOWengineering_DesignMuseum_Culture_Belgium_011
WOWengineering_DesignMuseum_Culture_Belgium_010
WOWengineering_DesignMuseum_Culture_Belgium_002
WOWengineering_DesignMuseum_Culture_Belgium_012
WOWengineering_DesignMuseum_Culture_Belgium_014
WOWengineering_DesignMuseum_Culture_Belgium_003
WOWengineering_DesignMuseum_Culture_Belgium_018
WOWengineering_DesignMuseum_Culture_Belgium_019
WOWengineering_DesignMuseum_Culture_Belgium_020
WOWengineering_DesignMuseum_Culture_Belgium_015
All Projects

Shaping a sustainable future together

We engineer low-carbon structures.
Through close collaboration, we create resilient and responsible solutions for your projects

Send an email
Call us +32 (0) 81 414 899
WOW offices
Linkedin Facebook Instagram
  • contact@wow-engineering.com
  • +32 (0)81 414 899
  • About
  • Services
  • Projects
  • Team
  • Jobs
  • News
  • Contact
  • Equipment
  • Sitemap
  • Privacy Policy
  • About
  • Services
  • Projects
  • Team
  • Jobs
  • News
  • Contact
  • Equipment
  • Sitemap
  • Privacy Policy

This Website Uses Cookies

This website may use cookies to enhance your browsing experience, analyze site traffic, and personalize content. By clicking “Accept All,” you consent to the use of cookies. For more information on how we use cookies, please visit our Privacy Policy.

Accept essential cookies only