Skip to content
  • Projects
  • Services
  • About
  • Jobs
  • Contact
  • News
  • Projects
  • Services
  • About
  • Jobs
  • Contact
  • News
FLOW, immeuble de bureaux bas carbone à Leudelange (Luxembourg), structure mixte bois-acier. bureau d'étude bois, timber, wood engineering, CLT, cross laminated timber, GLT, bois lamellé-collé, ossature bois, lamibois, LVL, glulam, stabilité, bureau d'étude structure, ingénieur bois, résille, treillis, panneau, circularité, bas carbone, poutre, colonne, école en structure bois, bureau en structure bois, crèche en bois, bâtiment bois, RT2020, European Green Deal, calcul d'assemblage bois, cadwork, étude d'exécution, calcul, FLOW, immeuble de bureaux, Leudelange, Luxembourg, structure mixte bois-acier, poteaux-poutres, planchers CLT, colonnes en lamellé-collé, contreventement, noyau béton armé, patio central, BREEAM Excellent, WELL Gold, NZEB, BIM Revit

25.044

FLOW – Laval

Luxembourg

Leudelange

0 sqm
0 T. C02 Stored

Context

FLOW is a new office building located in Leudelange, Luxembourg. Developed by Paulux Invest and designed by ARCHi2000 & Associés, it comprises approximately 10,700 m² of gross floor area spread over four above-ground levels and three basement levels, organised around a central landscaped patio. The project carries a strong environmental ambition, targeting BREEAM Excellent, WELL Gold and Nearly Zero Energy Building certifications, in line with the European taxonomy. Its structure is based on a low-carbon hybrid timber-steel system, fully modelled in BIM (Revit).

Particularities

The superstructure uses a hybrid column-and-beam system that puts the right material in the right place. Continuous steel beams provide large spans and bear on glued-laminated timber columns arranged on a regular 8.10 × 5.40 m grid; the cross-laminated timber (CLT) floors span 5.40 m, with their soffit left exposed, as are the columns. Stability is provided by two continuous reinforced-concrete cores, complemented by cross-bracing in glued-laminated timber placed on the gable ends. Reinforced concrete is otherwise limited to the three basement levels, built as flat slabs with a perimeter retaining wall. With nearly 1,200 m³ of structural timber, the project achieves a reduction in carbon footprint of around 30% compared with an all-concrete solution (Énergie et Environnement study). The structure is designed for 90 minutes fire resistance, and WOW Engineering provides the complete stability engineering mission.

Mission Type
Global stability study
Location

3, rue Léon Laval – Leudelange

Study
2025
– 2026
Execution
2027
Architect
ARCHi2000
Client
Paulux Invest
© Copyrights
Onirism
Certification
Well
All Projects

Shaping a sustainable future together

We engineer low-carbon structures.
Through close collaboration, we create resilient and responsible solutions for your projects

Send an email
Call us +32 (0) 81 414 899
WOW offices
Linkedin Facebook Instagram
  • contact@wow-engineering.com
  • +32 (0)81 414 899
  • About
  • Services
  • Projects
  • Team
  • Jobs
  • News
  • Contact
  • Equipment
  • Sitemap
  • Privacy Policy
  • About
  • Services
  • Projects
  • Team
  • Jobs
  • News
  • Contact
  • Equipment
  • Sitemap
  • Privacy Policy

This Website Uses Cookies

This website may use cookies to enhance your browsing experience, analyze site traffic, and personalize content. By clicking “Accept All,” you consent to the use of cookies. For more information on how we use cookies, please visit our Privacy Policy.

Accept essential cookies only