Skip to content
  • Projects
  • Services
  • About
  • Jobs
  • Contact
  • News
  • Projects
  • Services
  • About
  • Jobs
  • Contact
  • News
Photo of Royal music conservatory, school renovation in Brussels, Belgium

18.068

Royal music conservatory

Belgium

Brussels

Context

The Dutch-speaking and French-speaking Royal Conservatories of Brussels share a valuable ensemble of listed historic buildings, which will be restored and brought up to contemporary standards of comfort. A new building will also be constructed, with masterclass rooms, a chamber music hall, a rehearsal hall and an underground storage area.

The Brussels Conservatory was built at the end of the 19th century to a design by Jean-Pierre Cluysenaar and is still used for teaching today. Its monumental concert hall has excellent acoustics, an original organ and natural overhead light.
The whole ensemble, including the concert halls, the foyer and the historic director’s and secretary’s house, is being restored.
The design of the new building focuses on strong links between the old and new parts along Rue de la Régence and Rue de la Laine.
Six inner gardens structure the site and bring daylight deep into the buildings. Cluysenaar’s axis of symmetry is extended into the gardens and vertically through the building.
A large new top-lit staircase connects the classrooms of the old and new buildings and organises the new circulation.
The whole site is being transformed into a high-performance, sustainable educational facility that is also open to the public.

Particularities

The project involves several major structural and logistical challenges. The new building requires an excavation 14.5 m deep, with shoring along the existing monuments. This is achieved with hand-dug, shored trenches that enclose the excavation, initially up to 18 m deep.
The halls and classrooms will be acoustically isolated from the surrounding structures, and the structural grid is rotated at ground-floor level to make more room for the mobile archive (compactus) rooms.
In the renovated parts, the existing timber floors will be strengthened for higher loads, and new circulation routes will improve accessibility.
The roof of the large concert hall will be heavily strengthened to carry a heavier acoustic roof build-up that better shields the hall from outside noise. The existing timber trusses will be reinforced and several new steel trusses added.

Mission Type
Complete mission by Ney & PartnersTimber structure by WOW engineering
Location

Rue de la Regence 30 B 1000 BRUXELLES

Study
2021
– 2024
Architect
A2RCFVWWOrigin
Client
Région de Bruxelles - Capitale
All Projects

Shaping a sustainable future together

We engineer low-carbon structures.
Through close collaboration, we create resilient and responsible solutions for your projects

Send an email
Call us +32 (0) 81 414 899
WOW offices
Linkedin Facebook Instagram
  • contact@wow-engineering.com
  • +32 (0)81 414 899
  • About
  • Services
  • Projects
  • Team
  • Jobs
  • News
  • Contact
  • Equipment
  • Sitemap
  • Privacy Policy
  • About
  • Services
  • Projects
  • Team
  • Jobs
  • News
  • Contact
  • Equipment
  • Sitemap
  • Privacy Policy

This Website Uses Cookies

This website may use cookies to enhance your browsing experience, analyze site traffic, and personalize content. By clicking “Accept All,” you consent to the use of cookies. For more information on how we use cookies, please visit our Privacy Policy.

Accept essential cookies only