
Execution design for the contractor RNH: structural check and feasibility of the connections designed at design stage, plus 3D modelling of a digital fabrication model.
The project is a business centre for companies working towards social change, built by the committed developer Mundo LAB.
The structure is a steel post-and-beam frame combined with Kerto-Ripa timber floors. The envelope consists of glazing and timber-frame boxes.
The main feature of this project is the reuse of steel sections salvaged from demolished buildings: 95% of the sections come from the reclamation sector, which drastically reduces the environmental impact of the steel structure.
Achieving this required a great deal of coordination and checking. Some of the salvaged sections did not have the same cross-section or length as those in the original design, and some could no longer be welded, so additional connections had to be designed.
The Kerto-Ripa floors also required detailed study of the installation details to keep the floor build-up as compact as possible.
Louvain-La-Neuve
This Website Uses Cookies
This website may use cookies to enhance your browsing experience, analyze site traffic, and personalize content. By clicking “Accept All,” you consent to the use of cookies. For more information on how we use cookies, please visit our Privacy Policy.